Record unplanned refining separately from the quoted polishing sequence so repeated finishing work becomes visible and can be reduced.
Updated · NANOLAB Knowledge

Extra refinement often disappears into a job’s total labour time. Without a separate record, the workshop cannot distinguish an intentionally demanding finish from recurring process failure.
Record the accepted sequence from the test area. If inspection requires another step beyond that sequence, log the reason and time as unplanned refinement. Keep customer-requested scope changes separate.
| Reason | Example |
|---|---|
| Residual haze | Additional finishing required |
| Missed defect | Local correction repeated |
| Process variation | Pad or technique changed unexpectedly |
| New scope | Customer approved a higher target |
If ten jobs use 30 total hours of planned polishing and six additional hours of unplanned refinement, the extra work equals 20% of planned polishing time. That is an illustrative calculation; use the workshop’s own definitions and records.
Compare paint condition, product system, pad state and inspection method. A concentration of rework on one difficult paint type may call for a different accepted process rather than a general training complaint.
After changing the process, verify both reduced extra time and the same accepted finish. Reclassifying unplanned work as planned does not by itself improve productivity.
The record should be easy to complete during normal work. A reason, duration and affected zone are often enough to reveal a recurring issue that was previously hidden inside a seemingly unpredictable job margin.