A full polishing range.
From cutting and one-step correction to final finishing.
Changing cleaner halfway through a coating trial changes the maintenance history.
Updated · NANOLAB Knowledge
Changing cleaner halfway through a coating trial changes the maintenance history. The trial may still provide useful observations, but the transition must remain visible in the analysis. Do not attribute every later difference to coating age when the cleaning process also changed.
Identify both cleaners, their permitted use, application methods and dates. Confirm compatibility with the tested coating and substrate before introducing the replacement. Note whether the new routine includes a drying aid, topper or another product that was absent before.
Inspect and record the surface around the transition using the established method. Keep the data from both periods rather than discarding the earlier record because the process is no longer uniform. Explain why the change occurred, such as product availability or a planned maintenance comparison.
If the cleaner change is the actual research question, design it as a deliberate comparison with suitable references instead of treating an uncontrolled switch as a complete experiment.
Report the trial as separate maintenance phases where appropriate. A later improvement or decline may suggest a question about cleaner interaction, but timing alone does not establish the cause. Other exposure and measurement factors may also have changed.
For a controlled product comparison, a repeat using a defined maintenance protocol may be necessary. For a real-service log, the mixed history can still be useful if described honestly. The key is to distinguish the original coating from the complete maintained system and to avoid presenting a changing routine as though every variable except time remained fixed.
For instructions for your exact NANOLAB product and surface, use the current product documentation or contact NANOLAB.