A panel map should distinguish application from inspection. Marking both stages helps a team resume work without guessing what remains.
Updated · NANOLAB Knowledge
Use separate entries for prepared, applied, levelled and inspected where those states fit the product process. Avoid a single tick called done when different installers interpret it differently. Keep the map available without bringing contaminated paperwork onto prepared paint.
Identify the last completed area using fixed vehicle features. Note any application interruption, changed conditions or unresolved residue. Do not restart across a section boundary using an assumed timing when the actual coating instructions require assessment.
Read the record and inspect the vehicle before continuing. A second installer should know what is confirmed and what needs a check. Complete the final inspection across transitions, then retain the map with the job history rather than relying on memory at delivery.
Only if its meaning is genuinely unambiguous. Separate stages usually make interruptions and handovers clearer.