Professional Detailing1 min read

Scheduling four stations around two inspection lights

If four stations require an inspection at the same time and only two lights are available, schedule two inspection waves.

Updated · NANOLAB Knowledge

If four stations require an inspection at the same time and only two lights are available, schedule two inspection waves. Check whether the product has a time-sensitive step before sending any station into a queue.

In the workshop

Training inventory depends on stations, rounds and replacement rules. Count materials that must stay separate by product or surface, and check whether inspection equipment can serve all stations on time.

Try it on a job

Check the example against a simple upper or lower bound. Identify the number that would make the plan infeasible, then state which product, equipment or stock record you would consult.

Related guide: Counting clean towels for two full training rounds.

Original NANOLAB Academy field note (Hebrew).