Approval of a coated panel before delivery does not describe its condition after transport and installation. Plan a final inspection of the installed assembly so new contact marks or incomplete areas can be identified at the appropriate stage.
Updated · NANOLAB Knowledge
Keep the factory or workshop acceptance record linked to the panel identity. Then define which observations will be repeated on site and who will assess changes. Installation may involve handling, protective materials and adjacent work that were absent from the original trial. A staged record helps the teams discuss those changes without guessing their sequence.
Illustrative example: a decorative panel leaves the workshop with an accepted finish but develops a contact mark during installation. Comparing the two dated records helps locate when the condition changed and keeps the repair discussion separate from the original coating application.
Do not use the pre-dispatch record to dismiss a later issue or assume responsibility from a photograph alone. The final handover should state the observed condition and unresolved items. Any remedial treatment needs approval for the actual finish and coating system.
Discuss the intended surface with NANOLAB. Use the current product documentation for formulation-specific instructions.