Application & Curing1 min read

Recording water exposure, first wash and full cure separately

Enter each milestone from the exact product sheet on the job card.

Updated · NANOLAB Knowledge

Enter each milestone from the exact product sheet on the job card. Early water exposure, the first permitted wash and full chemical cure answer different scheduling questions.

In the workshop

A workshop may stock several similarly named formulas. Put the bottle, its current technical sheet and the vehicle's finish information beside each other. Identify the instruction that determines whether this job can proceed.

Try it on a job

Inspect the exact working boundary from the levelling position. Recheck a neighbouring edge or recess that could feed water, dust or residue back onto the panel.

Related guide: Which revision of a coating technical sheet belongs with the job?.

Original NANOLAB Academy field note (Hebrew).